Under Construction

Slover Commerce Center

671,557 square foot speculative concrete tilt-up distribution warehouse including 10,618 square foot office. 

Fontana, CA

671,557 square feet

July 2017

  • Developer: Alere Property Group
  • Prime Inland Empire West location at Etiwanda and the 10 Freeway
  • 5 miles from Ontario International Airport
  • 40' clear height

Citrus Commerce Center

Three building development totaling nearly two million square feet, located in a prime Inland Empire West location.

Fontana, CA

1,837,720 square feet overall

August 2017

  • Three concrete tilt-up distribution buildings
  • Building 1: 630,784 square feet
  • Building 2: 1,004,008 square feet
  • Building 3: 202,928 square feet
  • Three of the five buildings at this intersection built by Fullmer

Pomona Distribution Center

Professional business park consisting of six state-of-the-art shell concrete tilt-up buildings with tenant improvements. 

Pomona, CA

433,493 square feet

August 2017

  • Developer: Crow Holdings Industrial
  • Situated on 19.89 acres
  • Build-to-suit offices with mezzanine
  • 120' and 125' securable truck courts
  • Quick access to 71, 60, 57 and 10 freeways

IPT Perris Distribution Center

864,000 square foot cross-dock concrete tilt-up industrial building.

Perris, CA

864,000 square feet

September 2017

  • Developer: Industrial Property Trust
  • 36' clear height
  • 8" reinforced concrete slab
  • 180' and 232' secured truck courts
  • Close proximity to 215 freeway

The Walk

New two-building medical office complex, full remodel of a third building and new three-story parking structure.

Newport Beach, CA

134,460 square feet overall

September 2017

  • Two new three-story steel–framed buildings
  • Full rehab to existing third building
  • Three-story parking garage
  • Built adjacent to open businesses, displaying Fullmer’s flexibility & capability to adapt

Arcadia Logistics Center

Three building development totaling nearly 700,000 square feet.

Arcadia, CA

698,894 square feet overall

October 2017

  • Developer: Yellow Iron
  • Prime location near the 10, 210 and 605 freeways; 15 minutes from downtown LA and minutes from the Port of LA and Port of Long Beach
  • LEED certified
  • 32' clear height
  • 185' truck courts

I-210 Logistics Center III

702,668 square foot concrete tilt-up "Class A" distribution facility.

Fontana, CA

702,668 square feet

November 2017

  • One of three new buildings currently under construction for Panattoni by Fullmer in the booming I-210 industrial corridor
  • 15,000 square feet of office space
  • Cross-dock facility with 94 dock doors
  • LEED Certified

Pacific Bandini Center

New state-of-the-art build-to-suit manufacturing facility.

Vernon, CA

264,594 square feet

December 2017

  • Developer: Pacific Industrial
  • New build-to-suit bottling and distribution facility for well-known organic tea maker
  • 9,220 square foot two-story office space
  • Prime street frontage in heavy industrial area
  • Direct access to 710 freeway and nearby LAX 

The Ranch

Six building development totaling nearly one million square feet, including 145,000 square feet of office space.

Eastvale, CA

936,000 total square feet

January 2018

  • Developer: First Industrial
  • 50 acre master-planned business park comprised of six intelligently designed concrete tilt-up buildings
  • State-of-the-art features include ESFR sprinklers, LED warehouse lighting, concrete truck courts and drought tolerant landscaping
  • Extensive street frontage
  • Key Inland Empire West location in booming city of Eastvale

MCA Business Center

New 140,139 square foot multi-tenant industrial building with site work.

Temecula, CA

140,139 square feet

January 2018

  • The first industrial development built in Temecula in more than 8 years
  • The last developable land parcel in Temecula with the capacity to accommodate a building in excess of 100,000 square feet
  • Situated on 8 acre site